Euro NATO Joint Jet Pilot Training Facility

Total Construction Cost:   $13.4M

Project Size:   44,000 Square Feet

Customer:  US Army Corps of Engineers

Location: Wichita Falls, TX

Description:  A new operations facility for the 80th flying training wing. The facility includes a Commander’s office suite, classrooms, 328 seat auditorium with skyfold dividing partitions, training labs, student study areas, restrooms and conference areas. The building shell is designed with an average STC rating of 55 and incorporates insulated concrete forms (ICF) walls and a structural steel frame.